Christmas rail closures at Paddington, Heathrow link back 31 Dec
Engineering work by Network Rail means no main line trains will reach London Paddington from Christmas Day, with Heathrow Express and Elizabeth line services between Paddington and Heathrow resuming on 31 December 2026. In east London, work at Forest Gate will disrupt the Liverpool Street line until the early hours of 4 January 2027.

Paddington and Heathrow
Londoners flying to Turkey or visiting family over Christmas and New Year face extensive engineering work on the railway. According to rail infrastructure body Network Rail's page for the 2026-27 festive period, Paddington station closes to trains from Christmas Day. Heathrow Express and the Elizabeth line will resume services between Paddington and Heathrow on 31 December 2026, while Elizabeth line trains will not run further west, beyond the Heathrow branch, until 4 January 2027.
GWR trains to terminate at Reading
Network Rail says Great Western Railway (GWR) trains will be unable to reach Paddington until Monday 4 January 2027, with long-distance services starting and ending at Reading and some diverted to Euston. The station will stay open for toilets and other facilities. The central section of the Elizabeth line will keep serving Paddington's low-level platforms except on Christmas Day and Boxing Day. As reported by Secret London, Avanti West Coast and London Northwestern services from Euston will run reduced or amended timetables between 27 December and 3 January, partly to accommodate the diverted trains.
East London: Forest Gate
Network Rail says a ten-day track replacement at Forest Gate, starting on Christmas Day, means no Greater Anglia or Elizabeth line trains will run through the area until the early hours of Monday 4 January 2027. According to ianVisits, writing on 9 November, the Elizabeth line will not run between Stratford and Romford from 27 December to 3 January, with rail replacement buses, and Greater Anglia will run buses between Ingatestone/Shenfield and Newbury Park. Network Rail says the Liverpool Street to Cambridge route via Stansted Airport is not affected.
Redhill, c2c and the holidays
Network Rail says work at Redhill runs from 20 December to the early hours of 4 January, with trains to Brighton and Gatwick Airport still running and buses replacing trains from Reigate and stations between Earlswood and Purley. According to Secret London, c2c will run rail replacement buses between Upminster, Rainham, Purfleet and Grays from 27 to 29 December because of work at Barking. Network Rail notes that most routes in England will have no trains on 25 and 26 December and says it is investing £152 million in this year's projects.
This article is general information, not legal or financial advice. Always check the latest rules on GOV.UK or with a regulated professional.
