Iraq resumes oil flows through the Kirkuk–Ceyhan pipeline after 12 years
Iraqi crude is flowing again to Türkiye's Mediterranean port of Ceyhan through a pipeline idle since 2014 because of ISIS attacks. The target is 500,000 barrels a day.
What has changed
According to Iraqi Oil Minister Basim Mohammed Khudair, pumping through the Kirkuk–Ceyhan line has resumed at 120,000 barrels a day, with plans to raise it gradually to 500,000 barrels a day. No timetable was given.
Why it stopped
The line, which links oil fields in northern Iraq to the Turkish port of Ceyhan, had been out of service since 2014 after repeated ISIS attacks.
Repairs approved
Anadolu Agency reports that Iraq's cabinet approved a recommendation to rehabilitate the pipeline; details of the work were not released.
This article is general information, not legal or financial advice. Always check the latest rules on GOV.UK or with a regulated professional.
